Multi-Parameter Vertical Profiling System at UTMSI Pier (Part 4)

Finally, the cleaned and (anti-fouling paint) reinforced bottom bracket and guy wires were re-installed at the pier in July 2008.  During this time of waiting, students and I did manual time series sonde profiling over a month in June-July period at 4 hour intervals.   (0807)

Screen Shot 2016-07-19 at 1.32.33 PM

Advertisements
%d bloggers like this: